About M3 Floodtec

At M3 Group, we set the standard for quality, compliance, and innovation. As leaders in flood protection and construction solutions, we’ve built our reputation on excellence and reliability. Through M3 Floodtec and M3 Construction Services, we deliver trusted, accredited products and installations that protect communities, safeguard infrastructure, and help build a more resilient future.

Our Journey

2018

Acquisition of Flood Protection IP
We acquired patents, designs, and intellectual property from Global Flood Defence Holdings Ltd, including UKFB and Flood Angel products.

2018

M3 Floodtec Moves to Droitwich Factory
M3 Floodtec established operations in our new Droitwich facility to support flood protection projects.

2019

Upgrading Testing Facilities
Our BSI-approved testing facility was upgraded to meet new British Standards for flood-resistant products, including impact testing and advanced wave simulation.

2020

Joining the Parliamentary Review
M3 joined the Parliamentary Review to help set standards and promote best practices in the flood industry.

2020

Preparing for PAS 851188
We adapted our Droitwich test tank to meet the new flood product testing specification PAS 851188, ahead of its January 2021 implementation.

2020

Achieving CHAS and SSIP Compliance
M3 Floodtec achieved CHAS and SSIP compliance, ensuring safety and risk management across our supply chain.

2021

First PFR Flood Protection for Chestnut Homes
We delivered our first Property Flood Resilience (PFR) flood protection project for new homes built in floodplains.

2021

Forged Solutions Group Investment
Forged Solutions Group invested £0.5 million in flood protection for critical assets, our largest contract to date at Meadowhall and River Don sites.

2021

BSI Standard BS851188 Awarded
M3 Floodtec became the first UK flood protection specialist to have PFR products tested to the new BSI Standard BS851188.

2022

CHAS Elite Accreditation
We achieved CHAS Elite status, recognising our commitment to health, safety and compliance.

2022

Accoya Approved Manufacturer
M3 Floodtec was recognised as an approved manufacturer of Accoya products.

2022

Build Back Better Partnership
We partnered with FloodRe’s Build Back Better initiative to support resilient flood recovery solutions.

2022

Full BSI Certification
Our flood-resilient products achieved full independent certification by the British Standards Institute to BS851188, making us first to market.

2022

Environment Agency Framework Supplier
M3 Floodtec became a trusted supplier under the Environment Agency framework and DEFRA Property Flood Resilience Grant scheme.

2023

Launch of M3 Fenestration
We launched M3 Fenestration to separate flood-related projects from standard door and window installations.

2023

ISO 45001 and ISO 14001 Certifications
M3 Group achieved international certifications for occupational health, safety and environmental management.

2023

Awarded Lot 2 EA Framework
We secured a 4-year Environment Agency framework contract for Southeast and Southwest UK.

2024

New Offices at Attwood House
M3 Group opened new headquarters at Attwood House, Worcester.

2024

PAS 2030 Accreditation
We were awarded PAS 2030 accreditation, further expanding our credentials in building and retrofit standards.

2018
2018
2019
2020
2020
2020
2021
2021
2021
2022
2022
2022
2022
2022
2023
2023
2023
2024
2024

Centrally Located

Nationwide Coverage from Our Midlands Base

Located in Worcestershire with a fully established logistical network designed to cover the majority of the UK, we welcome the opportunity to tender for any new or existing development projects.

Experts in Fabrication

Proven Manufacturing & Delivery Expertise

Through our M3 Floodtec division, we have built a strong reputation as a leading UK fabricator, backed by extensive experience in manufacturing and installing precision-engineered flood resilience products. This expertise enables M3 Construction Services to deliver projects on time, within budget, and to the highest standards.

Specialist in Social Housing Projects

Certified & Accredited Quality

Energy Efficient Solutions As Standard

End-to-End, Turnkey Supply & Install

Proven Expertise in Precision

Industry Compliance Focus

Driving Innovation

Industry-Leading Testing & R&D Capability

Our Worcestershire head office houses a market-leading, BSI-approved testing and R&D facility, supporting the development of bespoke solutions and the demonstration of our non-flood products. Utilising the expertise of our M3 Floodtec division offers us the competitive advantage of being able to react quickly to clients’ needs.

Frequently Asked Questions

Are The Roofing Systems Custom-Made For Each Installation?

Lorem ipsum dolor sit amet consectetur adipiscing elit. Quisque faucibus ex sapien vitae pellentesque sem placerat. In id cursus mi pretium tellus duis convallis. Tempus leo eu aenean sed diam urna tempor.

Pulvinar vivamus fringilla lacus nec metus bibendum egestas. Iaculis massa nisl malesuada lacinia integer nunc posuere. Ut hendrerit semper vel class aptent taciti sociosqu. Ad litora torquent per conubia nostra inceptos himenaeos.

Do You Supply To Individual Installers As Well As Developers & Contractors?

Can Conservatory Roof Systems Be Used To Upgrade Or Replaced Existing Roofs?

How Long Does It Take To Install Conservatory Roof Systems?

Get in Touch

* indicates required fields


By submitting this form, I confirm that I have read and agreed to M3 Construction Services Terms & Conditions and Privacy Policy

© 2026 M3 Construction Services