Great Wyrley, Staffordshire
Client: Strut Hairdressing
The Problem
Maintaining business continuity is fundamental to the success of any operation. When flooding occurs, regardless of the cause, a lack of adequate flood protection and resilience can significantly disrupt operations.
In this case, ageing wooden windows and a deteriorated rear door provided insufficient resistance to flood water, increasing the vulnerability of the property.
The Solution
The existing windows and doors were upgraded to improve flood resilience. A flood-proof front façade was installed, incorporating an anti-flood door with a black external finish and white internal finish.
At the rear, the door and screen were replaced with a new white UPVC Flood Defender door and panel screen, complete with a Georgian wire panel and top lights, enhancing both protection and durability.